Air Cooling Multi-Angle Fitting 315-630mm Butt Fusion Welder PPR Welding Machine PE Pipe Fittings Ma
Detailed specification for Air Cooling Multi-Angle Fitting 315-630mm Butt Fusion Welder PPR Welding Machine PE Pipe Fittings Ma
Review product features, application details and supporting information below. For pricing, samples or shipping questions, use the inquiry form on this page.
| Model NO. | 630mm |
| Control | Semi-Automatic |
| Frequency Range | Intermediate Frequency |
| Electric Current | AC |
| Type | Hot Melting |
| Color | Red, Black and Customized |
| Guarantee | 2 Years Quality Warranty |
| Welding Type | Hydraulic Pump Drive |
| Brand Name | Neutral, Huajin or OEM |
| Transport Package | Plywood Cases |
| Specification | 6300kgs |
| Trademark | Huajin |
| Origin | China |
| HS Code | 8515290000 |
Product Details:
Product Name: 630mm Pipe Hydraulic Butt Welding Fusion Machine
Item No.: HDG-630
Welding Type: Hydraulic Pump Drive
Brand Name: Neutral, HUAJIN or OEM
Color: Red, Black and customized
Guarantee: 2 years quality warranty and spare parts factory cost.
MOQ: No MOQ
Welding Introduction For HDPE:
1. Fix the proper clamps on the machine rack.
2. Put HDPE pipes on the clamps and tighten the bolts.
3. Mill the end of the HDPE pipes with the facer.
4. Put the heater plate on the machine rack and heat the pipes for proper time.
5. Remove the heater plate and connect the HDPE pipes.

Feature: Removable PTFE coated heating plate.
Electric planing tool with safety limit switch.
Low starting pressure and high reliable seal structure.
Separate twe-channel timer records time in soaking and cooling phases with alert.
High and accurate and shockproof pressure meter indicates clearer readings.
Digital pressure meter is installed on machines.
Reliable performance, easy control.


P1: Approach and preheating pressure,
P2: Maximum heating pressure,
P5: Welding pressure,
Pt (Drag pressure): pressure necessary to overcome the friction of the machine. It must be measured by the operator
with the pressure gauge of the hydraulic unit.
t1, t2, …, t5: duration of phases 1,2, …, 5.
1- Approach and Preheating Phase. Bring the edges to be welded closer with the thermal element at
the pressure (P1+Pt) so that the edge reaches the dimension provided for by the standard used.
2- Heating Phase. Reduce the pressure to the maximum value P2, sufficient to maintain contact of the edges of the
pipe with the thermal element, for the time t2
Note: The operator, by reducing the pressure, must be careful not to detach the edges from the thermal element. If
this happens, the welding must be repeated.
3- Phase of Extraction of the thermal element. Remove the thermal element at the maximum time t3, without damaging the edges of the two elements to be welded.
4- Phase of reaching the welding pressure. Put the edges in contact, progressively increasing the pressure up to the value (P5+Pt), in time t4. Prevent the soft material from coming out of the surfaces that were approached.
5- Welding Phase. Keep the edges in contact under pressure (P5+Pt ) for time t5.
Do not use water or compressed air to accelerate the cooling of the fusion. If necessary, protect the weld from
rain, wind or excessive solar radiation.




Zhejiang Huajin Welding Machine Equipment Co., Ltd. is developed from Zhuji Huida Pipeline Technology Co., Ltd. It is one of the earliest professional enterprises engaged in the research, development and production of HDPE pipe welding equipment in China. The company covers an area of 20000 square meters and owns various production plants of 30,000 square meters. It is one of the largest HDPE pipe welding equipment manufacturers in China.
After more than ten years of development, the company has casting, machining, painting, sheet metal, packing workshops and so on.The main products include a full range of butt welding machine, CNC welding machine,electrofusion,fitting welding machine, HDPE/PPR pipe cutting tools, as well as a variety of special construction tools.
The products of Huida and Huajin series have been widely used by domestic pipe, pipe fitting manufacturers, gas and water companies and professional construction companies, etc., and have won wide favor in the domestic and international markets with their excellent cost performance and reliable quality.
After years of development ,our company have accumulated rich experience in technology development, enterprise management, production and sales, cultivated an excellent and professional team. And we have established a good cooperative relation with HDPE/PPR pipe companies, polyethylene pipe users, professional construction companies , and it is useful on our product development, technological innovation and product upgrading advanced.
To produce quality pipe welding equipment, and let the world has no difficulty on welding of pipes. It is our eternal pursuit!

Zhejiang Huajin Welding Machine Equipment Co., Ltd.
Zhejiang Huajin Welding Machine Equipment Co., Ltd. supplies Air Cooling Multi-Angle Fitting 315-630mm Butt Fusion Welder PPR Welding Machine PE Pipe Fittings Ma for international B2B buyers. Contact the supplier to discuss bulk orders, sample arrangements, custom requirements and shipping timelines.
Frequently Asked Questions
Find quick answers about samples, payment, delivery, packaging and quality assurance before placing an order.
Q1: May I get one sample before placing order?
AYes, Sample are available. For normal products, samples are for free and you just need to bear the freight; For those high value products, you just need to freight and certain product cost. When we both cooperate for some times or when you are our VIP customer, free sample will be offered when you need.
Q2: Which payment is available for your company?
AT/T, L/C or Ali trade insurance. You can choose the one which is convenient for you.
Q3: How and when can I get my goods after payment?
AFor small quantity products, they will be delivered to you by international courier(DHL, FedEx, TNT etc.) or by air. Usually it will cost 3-5days that you can get the goods after delivery. For large quantity products,shipping by see is worthwhile.It will cost days to weeks to come to your destination port, which depends on where the port is.
Q4: Is there any possible to use my appointed label or package?
AYes. If needed, we'd like to use label or package according to your requirement.
Q5: How can you guarantee the goods you offer is qualified?
AWe always believe honesty and responsibility are basis of one company, so whatever products we provide for you all are qualified. We will have goods tested and provide COA before delivery for sure.
Q6: Is the price on this page correct?
AThe listed price is only for reference, for latest price, pls contact us directly.
Q7: How can I get some samples?
AWe are honored to offer you free samples, just need to pay the freight cost.
Compare similar items from the same supplier to simplify sourcing and bundled procurement.
Agricultural Farm Water Saving and Efficient DIY Drip Irrigation System Built-in Drip Irrigation Tap
Send your message to this supplier
Include product specification, quantity, destination port and packing needs to receive a faster and more accurate quotation.
Explore the newest items published by the supplier for fresh sourcing opportunities.
Benchmark comparable offers in the market and evaluate more sourcing options.