| Model NO. | DH-HDPE-water |
| Water Absorption | 0.12%~0.25% |
| Contraction Percentage | 1.0%~2.5% |
| Tensile Strength | 41-50MPa |
| Diameter | 20-1200 mm |
| Max Nominal Pressure | 0.6MPa-2.5MPa |
| Oxidation Induction Time | ≥20min |
| Elongation at Break | ≥350% |
| Transport Package | Standard Package |
| Trademark | DHPI |
| Origin | Shandong, China |
| HS Code | 3917390000 |
| Production Capacity | 500000 Kilometers /Year |
Product Description
PE Pipe for Water Supply is Single-layer Pipe with Solid Wall.Layered Pipe for trench-less engineering.


Connection Method
In pipeline connection, we can design and process many kinds of anisotropic pipe fittings for different complex working conditions, matching interface solutions to meet your individual needs. Donghong Pipe Industry has more than 70 sets of injection molding production equipment and other joints and connectors processing equipment and more than 700 sets of injection molds; at the same time, it has a single injection volume of up to 230,000 grams of ultra-large injection molding machine, which realizes the ultra-large fittings one-time molding processing, not only to fill the gaps in the domestic industry, but also for product quality to play a good role in ensuring the quality of the product.



Appliation Cases

1.Wenshang County Urban and Rural Water Supply Integration Project.This project, with an investment of hundreds of millions of dollars, is related to the drinking water safety of hundreds of thousands of people, completely solving the drinking water problems of the people in the villages and towns within the coverage area; the rate of meeting the standard of drinking water quality in the rural areas will be significantly improved; and the popularization rate of piped water will reach 100%.
2.High-standard farmland project.Donghong provides stable supporting irrigation pipeline system for the construction of high-standard farmland, adapting to local conditions and helping new agriculture, so that the good land can produce more grain and good grain.


3.This picture shows JingXin expressway, JingXin expressway pipe project runs through deserts, Gobi desert and other unmanned areas along the road, no road, no electric, no signal, no rescue, the project establish environment is terrible, After 75 days, Donghong people responsible for the pipe installation and inspection, 330km water supply project, bulge test successed for one time.














