Menu
Browse byCategory
×

Photo browsing finished

Browse again
Recommed
取消
1 / 4

3 Layers HDPE/PE/PP Composite Water Supply Pipe Production Extruding Machhinery

Mar 17, 2026
Expand all
3 Layers HDPE/PE/PP Composite Water Supply Pipe Production Extruding Machhinery
Model NO.20-110, 110-315, 315-630, 710-1200, 1600AutomationAutomaticComputerizedComputerizedCertificationCE, ISO9001:200



« Previous


3 Layers HDPE/PE/PP Composite Water Supply Pipe Production Extruding Machhinery 3 Layers HDPE/PE/PP Composite Water Supply Pipe Production Extruding Machhinery 3 Layers HDPE/PE/PP Composite Water Supply Pipe Production Extruding Machhinery 3 Layers HDPE/PE/PP Composite Water Supply Pipe Production Extruding Machhinery



Next »


Seller Products Visit Homepage >
HDPE Wastewater Treatment Facility

$30000.00/ Set View details

HDPE Hydropower Chambers Pipe Extr

$30000.00/ Set View details

Spiral Winding Corrugated Pipe Ext

$30000.00/ Set View details

HDPE Hollow Wall Spiral Winding St

$50000.00/ Set View details

PP PPR 1-Layer Multi-Layer Composi

$20000.00/ Set View details

Send your message to this supplier

Include product specification, quantity, destination port and packing needs to receive a faster and more accurate quotation.

Qingdao Sincere Machinery Co., Ltd.
Available today 30 times  |  Sent times  |  Remaining times
Model NO. 20-110, 110-315, 315-630, 710-1200, 1600
Automation Automatic
Computerized Computerized
Certification CE, ISO9001:2008, TUV
Customized Customized
Condition New, Under The Order
After-sales Service Send Engineers Install and Test Machine
Produced PE Pipes Applications Water Supply, Sewer, Sea Marine Pipe, Gas Supply
PE Pipe Structure Single Layer, Double Layer, Three Layers
Production Line Control Siemens PLC Touching Screen
Electric Parts ABB, Rkc, Omron, Simense
Produced HDPE Pipe Diameter 16, 315, 400, 500, 630, 710, 800, 1200, 1600
Pipe Molding Machine Spiral Shunt Extrusion Mould or Coating Mould
Delivery Conditions Fob CIF CIP
Processing Period 40-60 Days
Delivery Period 30days
Prepayment 30%+70%
Output 120-2500kg\H
Machine Brand Qingdao Sincere Machinery
PE Pipe Production Speed 0.1-30m/Min
Transport Package Stretch Film and Wooden Pallet, Wooden Packing
Specification Pipes Diameters 16,63,110,315,400,630,710,800,1200
Trademark Sincere Machinery
Origin Qingdao, China
HS Code 8477209000
Production Capacity 50 Sets\\Year

3 Layers HDPE/PE/PP Composite Water Supply Pipe Production Extruding Machhinery


Plastic PP PPR Water Supply Pipe Making Machine
New Technology Small Diameter HDPE/PP/PE Water Supply Pipe and Gas Supply Pipe Making Machine
High Efficient Plastic PP PPR Water Supply Pipe Making Machine
HDPE/PP/ Water Supply and Gas Supply Pipe Extrusion Machine.
HDPE Gas and Water Pressure Pipe Production Equipment Extruding Line (20-110,315,400,560,630,800,1200,1600mm).


1. HDPE/MDPE fuel gas/water supply pipe features:
This Large diameter HDPE/MDPE fuel gas/water supply pipe extrusion line is mainly used for producing large diameter HDPE/MDPE pipe. The pipe has some excellent features such as heating resistant, aging resistant, high mechanical strength, environmental stress cracks resistant, good creep resistant, etc. It is a preferred gas conduit for ductwork systems between city and its suburb, water supply in city.

2. Production line features:
 

3 Layers HDPE/PE/PP Composite Water Supply Pipe Production Extruding Machhinery

3 Layers HDPE/PE/PP Composite Water Supply Pipe Production Extruding Machhinery

 

3 Layers HDPE/PE/PP Composite Water Supply Pipe Production Extruding Machhinery

Extruders: Plastic Single-screw extruders for HDPE/PP, optinal SJ45, SJ55, SJ65,SJ75, SJ90,SJ100,SJ120,SJ150, L/D 33:1 or 38:1.
Extrusion capacity from 40kg/h to 1500kg/h.

High efficiency extruder is designed for HDPE pipe, equipped with reducer which is high speed and low noise, feeding section with cooling unit and reversing spiral groove, different pitch undulant screw which allows great output, lower melting temperature, and lower energy consumption.

 

Extrusion die-head
Single layer extrusion die mould, double layers extrusion die moudld, three-layers extrusion molds.
Distributed spiral composite extrusion die-head ensures the melting pressure and flux even and stable, the surface of pipe smooth and glossy.

3 Layers HDPE/PE/PP Composite Water Supply Pipe Production Extruding Machhinery

 

3 Layers HDPE/PE/PP Composite Water Supply Pipe Production Extruding Machhinery

Vacuum calibration water tanks, and spray water cooling tank: made of stainless steel ensures precise calibration and fast cooling.



 

 Multi claws haul-off unit: Chipless cutting machine:
speed adjusted by frequency inverter or by servo-motors. Be able to cut large diameter and thick wall pipe, servo-motors
Haulling speed: 0-30m/min.

3 Layers HDPE/PE/PP Composite Water Supply Pipe Production Extruding Machhinery

3 Layers HDPE/PE/PP Composite Water Supply Pipe Production Extruding Machhinery

Cutting machine

1.No-dust Cutter:The chip-free cutting machine can keep the production environment clean and noiseless. The incision is smooth and neat, which improves the appearance quality of the pipe.
2.Planetary Cutter:Planetary cutting machine with special hard fit blade, suitable for large diameter thick wall pipe cutting



3.Final product
 

3 Layers HDPE/PE/PP Composite Water Supply Pipe Production Extruding Machhinery

3 Layers HDPE/PE/PP Composite Water Supply Pipe Production Extruding Machhinery

4. Technical parameters:

ModelPipe Diameters(mm)Supporting extruder
(33:1 or 38:1)Extrusion capacity(kg\h)Total Installed Power(kw) SG-6316-63SJ65\33 SJ25\25120-180110 SG-11016-110SJ65\33 SJ25\25150-200130 SG-16050-160SJ75\33 SJ25\25150-220150 SG-25075-250SJ75\33 SJ25\25280-350280 SG-315110-315SJ90\33 SJ25\25250-350350 SG-450160-450SJ90\33 SJ25\25350-450400 SG-630315-630SJ120\33 SJ25\25550-850550 SG-800450-800SJ150\33 SJ25\25800-1300750 SG-1000600-1000SJ150\33 SJ25\25800-1300750 SG-1200800-1200SJ120\33*2 SJ25\25950-1600950 SG-16001000-1600SJ150\33*2 SJ25\251500-25001300


5. Our service
*We can provide customers with perfect installation and use services.
*We can provide customers with satisfactory products according to their needs.
*When problems arise during the use of products, we can provide appropriate solutions.
*The warranty period is one year, except man-damage.
*Welcome to visit our factory and looking forward to win-win cooperation.

6. Contact:
Fly Wang

more>Recommed