| Model NO. | plum-32 |
| Length | 6m |
| Internal Diameter | 32mm |
| Pipe Shape | Can Do Straight Tube Can Also Do Coil Tube |
| Product Characteristics | The Rigidity and Flexibility of The Product Are Go |
| Transport Package | Customizes |
| Specification | 32-6M |
| Trademark | FOSITE |
| Origin | Hebei Shijiazhuang |
| HS Code | 3917400000 |
PE perforated plum-blossom pipe is a kind of plum-blossom-shaped communication pipe, also called plum-blossom pipe and honeycomb pipe, which is made of PE particles as the main material and other formulas through a unique mold. The inner wall of this pipe is smooth and can be directly penetrated by optical cable, the utility model can save man-hour, has reasonable structure, high use value and long service life. The utility model is mainly used for the sheathing pipes of communication cables such as mobile, Tietong, Unicom, Netcom, radio and television, electric power, etc. 
USE SCOPE
1 the buried trench of the pipeline should be as straight as possible according to the design requirements and construction operations, such as uneven bottom of the trench can be paved with a layer of fine sand. Before burying the pipe, the hard material in the ditch should be removed to prevent the pipe from deformation. When starting to bury the pipe, 10-15CM of the porous pipe should be reserved in the manhole to run the cable. The tube should be blocked against the tube exposed to the end of the manhole. When burying the pipe, it is forbidden to mix the foreign matter into the pipe.
2 The pipe connection places the pipe-shaped locating rib upward, cleans the outer wall of the end pipe, then inserts the direct end bearing port, padding a plank on the end surface, hitting the plank with a hammer to make the pipe socket in place. At the directly opposite end of the socket, insert another tube directly into the socket and hold it in place, thus extending to the next manhole. In the actual construction, the length of each pipe is not necessarily connected with the length between the Manhole, in this case, according to the actual length of the manhole, distance good length of the pipe, and with a hacksaw saw cut, must be sawn evenly
3. After the docking is completed, one end of the manhole should be plugged with a pipe plug to prevent foreign body invasion. For the first installation of this product, do not backfill soil before laying the first section (distance between two manholes) . Try One or two holes with the cable threader, and then lay down the lower section after successfully piercing, this will be more assured.
4. after the pipe is laid, should first use fine sand or fine soil back-fill the height of the pipe, can not make the pipe hanging state, and then back-fill other soil, prohibit the big stones, big dry soil to hit the pipe. When the pipeline passes through the section which is seriously damaged by external force, the connecting hole is covered with cement concrete to ensure its absolute safety.