1.Artificial stone paintWhat should I do if a piece has fallen off?1、The quality and viscosity of the putty are not suitable.The glue within the putty powder is an essential component, primarily responsible for binding the various materials together. Insu

1.Artificial stone paintWhat should I do if a piece has fallen off?

1、The quality and viscosity of the putty are not suitable.

The glue within the putty powder is an essential component, primarily responsible for binding the various materials together. Insufficient glue content in the putty powder can lead to powder shedding. Similarly, even high-quality paints can be easily peeled off if the putty powder has a weak structure. Therefore, it is recommended to use putty powders with higher hardness.

2、The primer was not applied, or the primer was of poor quality and did not perform its function.

The primary function of the primer is to neutralize alkalinity, preventing it from penetrating the substrate and affecting the surface appearance. It also seals and strengthens the putty layer by penetrating the substrate, creating a bond between the putty and the topcoat. If the primer fails to properly bond the putty, it loses this fundamental function, and the intermediate and imitation stone coatings may detach from the wall.

3、Apply primer to the putty powder before it dries, or apply the second coat of paint to the first coat before it dries.

The drying time of the putty powder depends greatly on the prevailing weather conditions. If the weather is favorable and the humidity is low, the putty powder will dry faster. Conversely, in unfavorable weather conditions (around 25°C), it may take longer to dry. In good weather, it is generally possible to apply and level the putty powder once a day, and it typically takes three days to complete the drying process before sanding and painting. This process requires patience; it is essential to allow the putty powder to dry completely before sanding and painting.

The drying time for the primer and topcoat needs to be adjusted based on actual weather conditions. In rainy or humid weather, the drying time should be extended accordingly. Typically, after applying the primer, you can apply the first coat of paint 3 to 4 hours later. The first coat should dry for 2 to 3 hours before applying the second coat.

4、Excessive residual materials can also affect the layering of the wall and putty.

To avoid common paint surface issues, it's important to avoid common mistakes during construction, such as:- Basic cleaning of the wall surface. If the wall surface has a lot of dust, it will affect the final result.- Pay attention to the humidity of the wall surface. Choose the appropriate putty powder and primer, and do not directly apply paint.

II.Exterior imitation stone paintCommon Questions & Solutions

1、The painted finish with imitation stone paint is uneven.

Main causes: Inaccurate color matching, uneven dispersion of added coatings, or inconsistent coating thickness during spraying.

Solution: Reapply the second product, ensuring even distribution and consistent thickness. Apply in two coats for optimal results.

2、Cracking and blistering phenomena on the faux stone paint surface.

Main reasons: Inadequate substrate preparation, including substrate powdering, insufficient adhesion, or moisture and mold growth, leading to poor bonding.

Solution: Re-prepare the substrate, apply putty powder in layers, and ensure that each layer is completely dry before proceeding to the next step.

3、Frequent unevenness occurs after large-scale application.

Main reasons: Failure to properly level the surface during construction and lack of sanding to remove the marks left by troweling.

Solution: Implement uniform segmentation, and during the plastering process, carefully control the imprint left by the trowel. After troweling is complete, lightly sand any uneven areas.

4、Severe cross-contamination

Main causes: The construction process deviated from the specified procedures and requirements, leading to inadequate application of auxiliary materials and protective measures, ultimately affecting the final construction results.

Solution: Strictly adhere to the standard construction procedures, ensuring proper protection for doors, windows, and louvered frames, and utilize high-quality auxiliary tools to prevent cross-contamination.